Tools · 04 · Drawing Control

Who has sheet E-37,
and which revision.

On most jobs that question takes three emails. Here one register knows: every sheet, every revision with its reason, who it went to and when. It is fed from SDS/2 every hour, so it is never a day behind the model. Transmittals go out in one approval.

Register
one per job
Fed from SDS/2
hourly
Transmittal
one approval
  • Registerevery sheet on the job, main and miscellaneous, erection and shop
  • Revisionmark, date, reason, and what changed since the last issue
  • Holderwho was sent which revision, and when; who is still on an old one
  • Transmittalbuilt from the register, approved once, sent, logged
  • Reasonwhy each sheet was revised, written by the detailer who revised it
  • Ask"who has sheet E-37, and which revision?"

One register,
kept by the job

The register is not typed. It is read from the model and the approvals, so it cannot drift from either.

1

Fed

Every hour the register reads SDS/2: which sheets exist, which were revised, what the detailer wrote as the reason.

Machine reads
2

Revised

Every revision is logged with its mark, date and the reason the detailer wrote, and what changed since the last issue.

Machine logs
3

Approved

A transmittal is built from the register. One person approves it, with their name, and it goes.

Person approves
4

Answered

Who has what, at which revision, since when: read from the register, not from memory or a spreadsheet.

Machine answers

What a person
still does

The register records. People decide what goes out.

  • 01Approves every transmittal.Nothing leaves the office on the register's say-so. A named person approves each one.
  • 02Writes the reason.Why a sheet was revised is written by the detailer who revised it, in words your approver will read.
  • 03Not yet.It tracks our sheets. Drawings from the engineer or other trades are filed with the job but not revision-tracked by the register.

Never ask which revision again.

Send one package. Every sheet in it is on the register from the day it is drawn.

Start a package
what to send
— contract drawings and specs
— your shop standards
— the sequence or phase
— the date you need it